Carts: Full carts.
Stimp Meter Reading: NA due to spray and water cycle after. Estimated 10’ 9”.
Course Setup: Full 18 pins and tee set up.
Greens: Sprayed with wetting agent and fertilizer. Please note that these products require an irrigation cycle right after the spray to wash the product off the plant leaf.
Tees: Mowed.
Rough: Mowed after morning tasks.
Fairways & Aprons: Mowed. 9 holes today on fairways.
Bunker Maintenance: 3 staff trimming, raking, weeding and levelling.
Irrigation: Head raising and a repairs.
SPECIAL PROJECTS:
April 15 – 27: Level and resod 5th hole tee decks (rock breaking/bedrock removal causing a delay. Please note that all the blocks on 5 will play from the forward tee today.
April 29 – May 10: Lower the remaining section of the 8-tee and build a small forward tee deck from leftover fill.
* Re-Install irrigation on the back of 10 green, 6/10 bunker complex. This bunker and rough area was designed in 2021 to be fescue, no mow, no maintenance so the irrigation was removed. However, after construction and Member feeback, it was decided to mow and maintain this area to improve aesthetics and playability – irrigation must be replaced.
* Minor path works are needed on 1, 3t, 5t, 6f, 7 par 3, 10g, 11g, and 16t before the interclub.
May 13 – 24, rebuild 3rd hole left greenside bunkers.
May 27 – 31, rebuild the 5th hole bunker.
June 3 – 14: rebuild the practice bunker and repair the back of “15A" South green.
June 17 – 21: Path grading.
June 24 – TBD: Redo walking paths/trackmatz on 14 and 15.
Additional Notes: As soon as the main tee deck on hole 2 is playable, we will resod the forward tee deck.
NATURAL AREA MANAGEMENT:
In addition to our selective herbice spray program, our Horticulturist Jacinda Chow and her CanAssist team will began the manual removal of invasive species in May and June. We will begin Natural Area Management in late May and all of June. The first areas to clear of invasives are:
Beach drive boulevards (working with Oak Bay Municipal Staff), transplanting native camas flowers into the area.
The path from 2 green, behind 12 tee.
The area right of 18 green below the flag pole.
ARBORICULTURE UPDATES:
The tree in the parking lot had died. We will remove this tree as soon as possible. We are currently developing a parkinglot improvement plan and will leave the area unplanted until the plans are complete and ready for implementation.